|
A Cabling Success at Durston UK |
|
|
|
“I am extremely pleased with the job which was done very professionally and presented to a very high standard. The team on site were industrious, obliging (even when I managed to throw in the odd curved ball), and left the site clean and tidy. (Even Robert (MD) commented on their approach to the job.)” Matt Ryan IT Manager Durston (UK) |
|
|
|
| A Cabling Success at Durston UKAnother successful infrastructure installation was completed recently by the Acorro cabling team. Durston UK were relocating to a new site facility in Biggleswade Herts. The new site comprises office and warehouse facilities and will form an integral part of the Durston UK expansion plans.There was an existing IT room which required a complete rewire. Acorro were tasked with overhauling the existing IT room and create a secondary server room. This included replacing the existing cabinet and patch panels. By doing this the existing 200 points could be re-labelled and cable managed properly. Around 150 New points could then added to both the ware house areas and offices.This enabled the Durston IT team to have control and management of the structured cabling system with a new plan and location for each point. In future any additions or changes could be carried out quickly and efficiently. |
| |
|